Project | 10 Wall Street Remediation Project | ||
---|---|---|---|
Location | New Haven, CT | ||
Year | 2013 – 2015 | ||
Work Done |
Project was a phased project starting 2013 and was an ongoing project until 2015. The project included the remediation of contaminated soils and demolition of existing building. The whole site was reconstructed to a new parking lot with sub surface drainage systems and installation of new fencing concrete sidewalks and drive way aprons. The site was also updated with LED light fixtures for the illumination of the parking area. The GC of the project was Standard Demolition Services and New Haven Parking Authority. |
||
Gallery |
10 Wall Street Remediation – 2013 – 2015
ComingSoon
Project | Village Bistro | ||
---|---|---|---|
Location | Milford, CT | ||
Year | 2013 | ||
Work Done |
This project consisted of the installation of a new parking lot and also included some new site lighting installation. This project was completed for the property owner. |
||
Gallery |
Coming Soon |
Village Bistro – 2013
ComingSoon
Project | New Beginnings Family Academy | ||
---|---|---|---|
Location | Bridgeport, CT | ||
Year | 2014 | ||
Work Done |
This project consisted of the renovation of existing court yard. This included the remediation of contaminated soils and demolition of existing concrete patio with the installation of a new sub surface drainage system with new ornamental fencing and concrete patio. This project was completed for the Garsan Construction and the City of Bridgeport. |
||
Gallery |
Coming Soon |
New Beginnings Family Academy – 2014
Project | GE Building | ||
---|---|---|---|
Location | Stamford, CT | ||
Year | 2013 | ||
Work Done |
Performed all the excavation for the installation of a new gas line including all parking lot restoration between buildings located at the Stamford Campus. This work was done with Direnzo Mechanical Contractor and Ge internal Cm Tishman |
||
Gallery |
GE Building – 2013
Project | Southport Center | ||
---|---|---|---|
Location | Fairfield, CT | ||
Year | 2013 | ||
Work Done |
Project included the restoration of the south port center. The project consisted removal and replacement of concrete sidewalks and handicap ramps with paver boarder. Also included new concrete curbing and asphalt patching of roadway. This project was completed for the Town of Fairfield. |
||
Gallery |
Southport Center – 2013
Project | Rowe Apts. Demolition | ||
---|---|---|---|
Location | New Haven, CT | ||
Year | 2013 | ||
Work Done |
Project Description: Installation of handicap ramp, temporary crosswalk and jersey barriers around work site in preparation of building demolition at 904 Howard Ave., New Haven, CT. This job was for the City of New Haven Housing Authority. |
||
Gallery |
Rowe Apts. Demolition – 2013
Project | UCONN Practice Basket | ||
---|---|---|---|
Location | Trumbull, CT | ||
Year | 2012 | ||
Work Done |
Project Description: Demolition of existing facility |
||
Gallery |
UCONN Practice Basket – 2012
Project | Walnut Beach Site Improvements | ||
---|---|---|---|
Location | Milford, CT | ||
Year | 2012 | ||
Work Done |
Tree Removal. Asphalt Pavement Demolition. New timber Post and Beam railing system. Installation of underground utilities. Installation of handicaped signs and cross walks. Replacement of all Catch basin frames and grates. Forming and Pouring of over 4000 linear ft of sidewalk.Installed over 6,000 linear ft of extruded concrete curbing. |
||
Gallery |
Walnut Beach Site Improvements – 2012